Blog Archives

17 – Improving ILP: Loop Unrolling and Scheduling

Activity 17 – Loop Unrolling and Scheduling

Posted in Slides Tagged with: , , ,

11 – Review of the Pipelined Datapath

Activity 11 – Basic Pipeline Questions   Hello everyone,Lots of notes todayProject: There is some ambiguity in the project description, apologies:  your “Alarm Clock Controller” module has 5 one-bit inputs and 6 outputs. The 6 outputs are: the 4 7’b

Posted in Slides Tagged with: , , , , , , , ,